The floor sheeting should square the floor....just make sure all sides line up.
Be sure to nail the sheeting on each joist. (You may need to run a chalk line to mark the joists).
When putting the walls on the floor make sure the bottom plate is tight to the floor. If your ground is not level, this may require you to pry up the floor.
Nail every 6" of the "skirt". It is best to use a galvanized nail for exterior use.
Mark center of peaked wall for ridge beam.
Nail trusses every 2'. When marking peak siding make sure to line up the siding lines and do the big pieces on both sides so you can use the left over siding for the smaller pieces.
On the standard shed, overhang the roof sheeting 3 1/2".
Add blocking under overhangs.
Nail overhang/L-shaped trim into blocks.
Hold and mark front peak trim.
After trim is marked, cut to size and nail to outside edge with small finish nails.
Before installing the door you will need to cut out the bottom plate in the door opening. Helpful tip: Nail in a scrap piece of 7/16 OSB at the bottom of the door opening...this will give you enough gap to allow you to screw the hinges in. Once hinges are in, open the door and remove the scrap piece.